Dennis Laird says: The hydraulic handling system for positioning the piles. The piles were fabricated in Belfast and transported to the site on board "Resolution" before being tipped into the vertical position and driven into the sea bed. (c) D. Laird 2005
(To save this picture as Windows Wallpaper - right click it -
then select "Set as Background") (or click the above image to see the full sized version)